When a PV inverter backfeeds a load-side busbar, 705.12(B)(3)(2) allows the main breaker plus the inverter breaker to total up to 120% of the busbar rating — provided the backfeed breaker sits at the opposite end of the bus from the main.

The canonical case: 200 A busbar with a 200 A main → 200×1.2 − 200 = 40 A maximum backfeed breaker (≈7.6 kW of inverter at 240 V). A 225 A busbar with a 200 A main allows 70 A. A 100 A subpanel with a 100 A main allows 20 A.

If you can't meet it: downsize the main, use the sum-of-supplies rule (705.12(B)(3)(1): main + PV ≤ 100% of busbar, any position), do an engineered load calculation, or connect supply-side under 705.11.

Run the numbers yourself

Need this as a permit-ready document?

One Document Credit ($29) buys a full clause-cited compliance PDF — wire sizing, voltage drop, overcurrent protection, every value traceable to the section it came from.

Get your document →

Every numeric value on this page is computed by the CircuitProof calculation engine — the same golden-tested code that renders our permit documents — not typed by hand. Code text is paraphrased and cited; always verify against your jurisdiction's adopted edition and a licensed professional before installation. Design documentation, not a stamped drawing.

More references: NEC Table 310.16 ampacity, explained · What wire size for a 100 A sub panel? · NEC 625: EV charger circuit sizing · NEC 706: battery energy storage disconnects · NEC 240.4(D): the small-conductor overcurrent caps · Voltage drop and the NEC: what's required vs recommended · all 97 references